I'm enjoying sharing ... my artwork, teaching, and stories with all of
you via my newsletters.
"If you want to make God laugh, tell Him you made plans...."
Same old story - Slow Progress
Building our new house is still extremely slow and frustrating.
The framing is completed. The roof shingles are on, windows and
exterior doors are installed, and the decks and railings are nearly
completed. I finished the Trex decking and railings myself.
The plumber came and completed the plumbing rough-in. They started two
weeks late and then finished in three days.
The HVAC men came and installed the ductwork. They also started two
weeks late and then finished in four days.
I framed out the duct system so that the sheetrock installers could
hang the drywall after insulation. It took me seven days of working in
98-degree heat with 80% humidity. I worked for about 6 hours per day. I
started a daybreak (6:30 AM) and stopped around noon.
The electrical rough-in is complete. He started seven days late. He
kept leaving after 3 hours of work. I found out that he did not want me
on site directing him or telling him where to place outlets, ceiling
lights, or switches. I had to leave the job site or he threatened to
quit. Without my input, he just guessed where I wanted things. He made
some wrong choices. He then had to redo several things. He finished in
10 days. It should have taken 5 days.
All in all, we are now almost four months behind where we should be.
Summer is over, it is now fall. There is still so much to do. Cindi & I
are frustrated.
We had our framing and electrical inspection on Thursday. We passed.
Now we can move on to insulation. I hope the insulation team shows up
on Monday.
While the electric work was going on, I set concrete forms for the
front porch and poured concrete into them. Then with the help of my
brother-in-law, we filled the porch base with gravel. Then I poured the
concrete porch. It took three weeks of very hard work. I also vented
the four bathroom exhaust fans and added the dryer vent.
On Monday I'll set the three 6" x 6" x 10' posts that support the roof
over the front porch.
Working with this contractor ( my third contractor) is still very
frustrating. I ask for updates and a schedule every week. Most times
all I get are some vague answers. I never know what exactly is next or
how much things will cost. Things are not getting better.
As soon as I can, I'll find someone new to help me and I'll do more of
the work myself.
To this point, I'm convinced I did a much better job as my own general
contractor on my last home in Woodland Park. It was certainly less
stressful. I'll probably take over managing the final phases of
construction when I feel I can handle it.
Just a note on my health; I'm slowly getting better. I'm still not
strong. My knees and legs get weak quickly. I'm still having issues
lifting. My right hand still trembles when I'm stressed or overly tired.
I'm improving.
I'll keep you posted on the progress.
No new pictures this week.
Image
5338291
Image
5338294
Image
5338298
Image
5338299
Image 5276806
Click Here To Sign Up For My E-Newsletter
Classes & Workshops make memorable and lasting gifts!
Shanika Studio
www.ShanikaFineArts.com
2111 Bagnell Dam Blvd
Box 1211
Lake Ozark, MO. 65049
Copyright 2023
All rights reserved
0
Advanced issue found
â–²
{{FASO_DOMAIN_VISIBLE}}
{{AM_COMPANY_NAME}}
{{AM_COMPANY_ADDRESS}}
{{AM_CSZ}}
{{AM_COUNTRY}}
Unsubscribe
Sent with ArtfulMail